WAO'98 Maintenance session Poster Abstract (Peter Gear) Information is given on the long term planning required for the preventative maintenance regime used at ISIS. The shift crews are responsible for ensuring faults occurring during operational periods are dealt with swiftly and that the lost time database is maintained.