Stan Pasky Bio. Stan Pasky spent fifteen years working in the reactor field. He joined the APS project in 1993 and worked on the construction of linac subsystems and testing of safety systems. In 1994 he became one of the first members of the operations group. In 1995 he became a crew chief, and shortly thereafter was promoted to a staff position in the operations group. His area of responsibility is the linac and tasks include maintenance scheduling, trouble shooting and operator training.